Civil Construction

 

Whistler Athletes Village  2006 - 2009

Drilling and blasting of over 125,000 cubic meters of bedrock for road construction, mass excavation for site grading, building site preparation, underground service trenches and gravel production.



Eagle Lake Membrane Treatment Facility, District of West Vancouver  2007

Drilling and blasting of 12,000 cubic meters of bedrock for road construction, industrial building site preparation, underground service trenches and gravel production



WhistlerBlackcomb Ski Resort, Whistler, BC  2006 - 2009

Drilling and blasting at numerous locations for ski run and road construction, building site preparation, underground service trenches. Sierra Drilling & Blasting Ltd. performed work at many locations on Whistler Mountain in preparation for the 2010 Winter Olympic Games.



Whistler Olympic Park, Callaghan Valley, BC  2006 - 2009

Drilling and blasting of over 75,000 cubic meters of bedrock for 2010 Winter Olympic Games Venue construction. Our work included road construction, building site preparation, quarries, underground service trenches and over 50 km of Biathlon trail construction.



Ashlu Creek Hydro-electric Project, North of Squamish, BC  2007 - 2008

Drilling services provided to Ledcor CMI Limited for production and wall control blasting at the lower portal of the diversion tunnel and powerhouse areas.



The Beasley Residences, Smithe Street & Homer Street, Vancouver, BC  2009 - 2010

Drilling and blasting of sandstone bedrock for TYAM Excavation & Shoring Ltd. in excavation for a new 34 story high-rise tower in the downtown core of Vancouver. This excavation was over 20 meters in depth when completed.



Fitzsimmons Creek Debris Barrier, 2009

Drilling and installation of Double Corrosion protected anchors for Dam construction on Fitzsimmons Creek above Whistler Village. Our work on this project also included high scaling and rock bolting if faces above the new dam structure.