Rock Slope Stabilization/ High Scaling
Rock Slope Stabilization/ High Scaling
Resort Municipality of Whistler, Taluswood Drive, Whistler BC 2009
High scaling, danger tree removal, removal and replacement of damaged shotcrete, drilling and installation of new drilled plastic drains in rock face to improve the safety of the rock slope above a municipal roadway.
BC Hydro, Southern Communities Grid Connection Project, Lillooet Lake, BC 2010
High scaling and danger tree removal along forest service road in preparation for new power line construction to serve remote communities located along the Lillooet River in southwestern BC.
BC Ministry of Forests and Range, Chilliwack Lake, BC 2010
Trim blasting of an un-stable rock mass, high scaling and danger tree removal to stabilize the remaining rock face after a major rockslide closed the forest service road.