Subdivisions / Roads

 

Parklane Homes Heritage Woods, Port Moody, BC  2007 - 2008

Drilling and blasting of over 35,000 cubic meters of bedrock for building site preparation, underground service trenches and gravel production. Drilling/installation of rock bolts.



Parklane Homes Oceans Crest , Furry Creek, BC  2008

Drilling and blasting of 15,000 cubic meters of bedrock in close proximity to occupied residences for building site preparation, underground service trenches and off-site quarry blasting for rip rap production for retaining wall construction. High scaling of rock faces and drilling/installation of rock bolts.



Silverstone, Sechelt, BC  2007

Drilling and blasting of 10,000 cubic meters of bedrock for road construction, building site preparation, and underground service trenches on a new waterfront development.



123rd Avenue Extension, Maple Ridge, BC  2009

Drilling and blasting of 6,000 cubic meters of bedrock for road construction, driveways, and underground service trenches.



Rock Point at Nature’s Door, Shoesmith Crescent, Maple Ridge, BC  2008

Drilling and blasting of bedrock on a 25 lot residential subdivision  for strata road construction, building sites and underground service trenches.



Telus Wedgemount Cellular Site, North of Whistler, BC  2009

Drilling and blasting of bedrock for 2.5 km of road construction to new cellular tower site. Our scope of work also included drilling and blasting for the tower foundation site, drilling and installation of foundation anchors and rebar dowels, and drilling, blasting and excavating pole holes and anchor installations for new powerline to the tower site.



Bell Mobility Brohm Ridge Cellular Site, North of Squamish, BC  2009

Drilling and blasting of of bedrock for 2 km of road construction to new cellular tower site above Highway 99.